The Amdjarass Wind Farm is a 1.1 MW wind farm in Amdjarass, Ennedi-Est, Chad. It is the first wind farm in the country.
| Amdjarass Wind Farm | |
|---|---|
| Country | Chad |
| Location | Amdjarass, Ennedi-Est |
| Status | Operational |
| Commission date | 2016 |
| Power generation | |
| Units operational | 4 X 275 kW |
| Nameplate capacity | 1.1 MW |
History
The wind turbines were erected in February 2016. It was then followed by the installation of its energy storage systems, generators and transmission line.[1] The wind farm was finally commissioned by end of 2016, making it the first wind farm in Chad.[2]
Technical specifications
The wind farm consists of four 275 kW wind turbines.[2] It was constructed by Vergnet.[1][3]
See also
References
- "France's Vergnet installs 4-turbine wind park in Chad". Renewables Now. 8 August 2016. Retrieved 17 January 2024.
- "Chad's first wind farm could be operational by 2025". Reve. 31 May 2022. Retrieved 17 January 2024.
- Whitlock, Robin (10 August 2016). "Phase 1 of Chad's Amdjarass wind farm now complete". Renewable Energy Magazine. Retrieved 17 January 2024.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.