Lokhandwala Minerva
Lokhandwala Minerva is a 301 m (988 ft), 78-floor residential supertall skyscraper in Mumbai, Maharashtra, India. As of 2024, it is the tallest completed building and the second building to reach supertall height in India.[lower-alpha 1]
| Lokhandwala Minerva | |
|---|---|
| Record height | |
| Tallest in India since 2023[I] | |
| General information | |
| Status | Completed[1] |
| Type | Supertall residential skyscraper |
| Location | Mahalaxmi Mumbai, India |
| Coordinates | 18.9870497°N 72.8278304°E |
| Construction started | 2011 |
| Completed | 2023[2] |
| Height | |
| Roof | 301 metres (988 ft) [3] |
| Technical details | |
| Floor count | 78 × 2 |
| Design and construction | |
| Architect(s) | Hafeez Contractor |
| Developer | Lokhandwala Infrastructure |
| Structural engineer | J+W Consultants[4] |
| Website | |
| lokhandwalaminerva | |
Hafeez Contractor served as the chief architect for the tower, while JW Consultants were the structural engineers. The tower underwent a redesign in 2015 which reduced the final height by 6 m (20 ft).[5]
Controversies
Delayed possession hearings
In 2023, home buyers of Lokhandwala Minerva were granted interest on delayed possession after hearings before MahaRERA, the real estate regulatory authority of Maharashtra state.[6][7]
Breach of conditions notice
In May 2023, the MahaRERA issued a show-cause notice, citing breach of conditions to Lokhandwala Kataria Constructions over false advertisements claiming the tower to be 90-storey tall, against the approved 77 floors.[8]
See also
References
Notes
- At 320 m (1,050 ft), Palais Royale became the first supertall skyscraper in India when it topped out in 2018, even though the building is still pending completion as of April 2024.
Citations
- "Lokhandwala Minerva". CTBUH Skyscraper Center. Retrieved 21 August 2023.
- "The Skyscraper Center". Skyscrapercenter.com. Retrieved 25 October 2023.
- "CTBUH Tall Buildings Database". Buildingdb.ctbuh.org. Retrieved 27 January 2011.
- "Minerva". Archived from the original on 20 October 2010. Retrieved 27 January 2011.
- "Lokhandwala Minerva - The Skyscraper Center". The Skyscraper Center by CTBUH. Council on Tall Buildings and Urban Habitat (CTBUH). Retrieved 17 April 2024.
- "Minerva home buyers get interest on delayed possession". Hindustan Times. Retrieved 17 April 2024.
- Nandgaonkar, Satish. "MahaRERA grants interest on delayed possession to Minerva buyer". Hindustan Times. Retrieved 17 April 2024.
- Marapakwar, Prafulla. "Bldr gets notice from MahaRera over 'tall claims' on SoBo tower". The Times of India. Retrieved 17 April 2024.