Aqua Line (Noida Metro)

The Aqua Line is a line of Noida Metro, a rapid transit system in Noida and Greater Noida in Uttar Pradesh, India. It consists of 21 metro stations from Sector 51 in Noida to Depot in Greater Noida.[3]

Noida Metro Aqua Line
Overview
StatusOperational
OwnerNoida Metro Rail Corporation
LocaleNoida, Greater Noida
Termini
Stations21
Service
TypeRapid transit
SystemNoida Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockCRRC Corporation
Daily ridershipNA
History
Opened25 January 2019 (2019-01-25)[1]
Technical
Line length29.7 kilometers (18.5 mi)[2]
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Noida Sector 51
Noida Sector 50
Noida Sector 76
Noida Sector 101
Noida Sector 81
NSEZ
Noida Sector 83
Noida Sector 137
Noida Sector 142
Noida Sector 143
Noida Sector 144
Noida Sector 145
Noida Sector 146
Noida Sector 147
Noida Sector 148
Knowledge Park II
Pari Chowk
ALPHA 1
DELTA 1
GNIDA Office
Depot

The line has been operational since 25 January 2019. It was inaugurated by Chief Minister of Uttar Pradesh Yogi Adityanath.[4]

Stations

All 21 stations on the 29.7 kilometres (18.5 mi) Aqua Line route are on elevated track.[5][6][7] This line has an interchange station with the Delhi Metro at Noida Sector 52 metro station.[8] All stations are equipped with platform screen doors.

Aqua Line
# Station name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
EnglishHindi
1Noida Sector 51नोएडा सेक्टर ५१125 January 2019Blue LineElevatedSideNoneNone
2Noida Sector 50नोएडा सेक्टर ५०125 January 2019NoneElevatedSideNoneNone
3Noida Sector 76नोएडा सेक्टर ७६125 January 2019NoneElevatedSideNoneNone
4Noida Sector 101नोएडा सेक्टर १०१125 January 2019NoneElevatedSideNoneNone
5Noida Sector 81नोएडा सेक्टर ८१125 January 2019NoneElevatedSideNoneNone
6NSEZएन॰एस॰ई॰ज़ेड॰125 January 2019NoneElevatedSideNoneNone
7Noida Sector 83नोएडा सेक्टर८३125 January 2019NoneElevatedSideNoneNone
8Noida Sector 137नोएडा सेक्टर १३७125 January 2019NoneElevatedSideNoneNone
9Noida Sector 142नोएडा सेक्टर १४२125 January 2019NoneElevatedSideNoneNone
10Noida Sector 143नोएडा सेक्टर 1४३125 January 2019NoneElevatedSideNoneNone
11Noida Sector 144नोएडा सेक्टर १४४125 January 2019NoneElevatedSideNoneNone
12Noida Sector 145नोएडा सेक्टर १४५125 January 2019NoneElevatedSideNoneNone
13Noida Sector 146नोएडा सेक्टर १५३125 January 2019NoneElevatedSideNoneNone
14Noida Sector 147नोएडा सेक्टर १४७125 January 2019NoneElevatedSideNoneNone
15Noida Sector 148नोएडा सेक्टर १४८125 January 2019NoneElevatedSideNoneNone
16Knowledge Park IIनॉलेज पार्क II125 January 2019NoneElevatedSideNoneNone
17Pari Chowkपरी चौक125 January 2019NoneElevatedSideNoneNone
18Alpha 1एल्फा १125 January 2019NoneElevatedSideNoneNone
19Delta 1डेल्टा १125 January 2019NoneElevatedSideNoneNone
20GNIDA Officeग्रेनो ऑफिस125 January 2019NoneElevatedSideNoneNone
21Depot Stationडिपो स्टेशन125 January 2019NoneElevatedSideDepot StationAt Grade

Construction

The NMRC has divided the Civil Construction work of Aqua Line (21 stations and 1 Depots) into multiple packages. The list of all construction contract is as follows:

Package Stations Contractor
NC-01 Noida Sector-51 to Noida Sector-137
(8 stations)
CEC and Sam India Buitwell (JV)
NC-02 Noida Sector-142 to Noida Sector-148
(7 stations)
CEC and Sam India Buitwell (JV)
NC-03 Knowledge Park II to Depot
(6 stations)
CEC and Sam India Buitwell (JV)
NC-04 Greater Noida Depot
(1 Depot)
Anupam Constructions
NGNC-01 Noida Sector-122 to Gr. Noida Sector-2
(5 stations)
GR Infraprojects

Note: The construction work of Package NGNC-01 will start by 2023 end.

See also

References

  1. "Uttar Pradesh CM Yogi Adityanath to inaugurate Noida Metro's 'Aqua line' on Friday". Zee News. 24 January 2019. Retrieved 25 January 2019.
  2. "DMRC". Retrieved 16 November 2018.
  3. "Noida Aqua Metro Line to be inaugurated by CM Adityanath today; here's all you need to know". www.businesstoday.in. Retrieved 25 January 2019.
  4. "Uttar Pradesh CM Yogi Adityanath to inaugurate Noida Metro's 'Aqua line' on Friday". Zee News. 24 January 2019. Retrieved 25 January 2019.
  5. "STATIONS BETWEEN NOIDA-GREATER NOIDA". noidametrorail.com. Archived from the original on 26 March 2016.
  6. Damini Nath. "Noida Metro Projects Still Off-Track". The Hindu.
  7. "Metro rail link between Noida and Greater Noida to be completed by 2017". India TV News.
  8. "Metro Network Phase I, II, III & NCR" (PDF). Delhi Metro Rail Corporation (DMRC). February 2015. Retrieved 28 June 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.