Barrow Haven railway station
Barrow Haven railway station serves the village of Barrow Haven in North Lincolnshire, England. The station has a single platform on the single-track line, with a shelter and a telephone on the platform. Stopping services from Barton-on-Humber to Cleethorpes call at the station. All services are provided by East Midlands Railway who operate the station.
| General information | |||||
|---|---|---|---|---|---|
| Location | Barrow Haven, North Lincolnshire England | ||||
| Coordinates | 53.697426°N 0.392933°W | ||||
| Grid reference | TA062235 | ||||
| Managed by | East Midlands Railway | ||||
| Platforms | 1[1] | ||||
| Other information | |||||
| Station code | BAV | ||||
| Classification | DfT category F2 | ||||
| History | |||||
| Opened | 1 March 1849 | ||||
| Passengers | |||||
| 2018/19 | 1,916 | ||||
| 2019/20 | 2,310 | ||||
| 2020/21 | 184 | ||||
| 2021/22 | 790 | ||||
| 2022/23 | 478 | ||||
| |||||
Passenger lines of North East Lincolnshire | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History
The station was opened as part of the branch line from New Holland to Barton-on-Humber in 1849.[2]
On 8 May 2022, the station closed to allow the single platform to be replaced in a £1.3 million project. It was expected to reopen in October.[3][4] The station reopened a month later in November. [5]
Services
All services at Barrow Haven are operated by East Midlands Railway using Class 170 DMUs.
The typical off-peak service is one train every two hours in each direction between Cleethorpes and Barton-on-Humber.[6]
On Sundays, the station is served by four trains per day in each direction during the summer months only. No services call at the station on Sundays during the winter months.
| Preceding station | National Rail | Following station | ||
|---|---|---|---|---|
| Barton-on-Humber | East Midlands Railway |
New Holland | ||
| Historical railways | ||||
Line and station open | Great Central Railway | Line and station closed |
||
References
References
- King 2019, p. 84.
- "Subterranea Britannica - NEW HOLLAND PIER STATION". Archived from the original on 22 February 2009. Retrieved 25 March 2009.
- "North Lincolnshire train station to get brand new £1.3m platform". GrimsbyLive. 10 May 2022. ISSN 0307-1235. Retrieved 13 May 2022.
- "Barrow Haven | EMR". www.eastmidlandsrailway.co.uk. Retrieved 7 October 2022.
- "All Aboard at Barrow Haven: revamped station reopens after £1.3m investment". Network Rail Media Centre. Retrieved 28 February 2023.
- Table 28 National Rail timetable, June 2024
Sources
External links
- Train times and station information for Barrow Haven railway station from National Rail