Bucharest Metro Line M6

M6 is an under construction metro line of the Bucharest Metro. The M6 Line will connect Bucharest North railway station (Gara de Nord) to Henri Coandă International Airport (Aeroportul Otopeni). The line is expected to be completed by 2028.[1][2] As of 2019, only the section from 1 Mai station to Tokyo station had secured funding.[3] On March 8, 2022, the contract for construction was signed; the contract for the second section from Tokyo station to the airport was signed on May 2, 2023.

Line M6
Aeroportul Otopeni
Ion I.C. Brătianu
Otopeni
Bruxelles
Paris
Washington
planned
under construction
Tokyo
Aeroportul Băneasa
Gara Băneasa
Piața Montreal
Expoziției
Pajura
1 Mai
Grivița
Basarab
Gara de Nord

Construction work has effectively started on December 15, 2023, for the first section between the 1 Mai station of M4 and the future Tokyo station.

Cost

The construction of the new line is estimated to cost around 1.2 billion. The Japan Bank for International Cooperation is financing the project with €300 million.[4]

Stations

The M6 Line will have a total of 16 stations: 4 stations shared with the existing M4 Line and 12 planned new stations: Pajura, Expoziției, Piața Montreal, Gara Băneasa, Aeroport Băneasa, Tokyo, Washington, Paris, Bruxelles, Otopeni, Ion I.C. Brătianu, and Aeroport Otopeni.[2]

PhaseTerminalsLengthTotal stationsConstruction sinceOpening
IGara de Nord 1 Mai (as part of M4)3.6 km (2.2 mi)419892000
II1 Mai Tokyo6.6 km (4.1 mi)6December 2023[5]2027 (est.)
IIITokyo Otopeni Airport7.6 km (4.7 mi)6Late 2024 (est.)2028[6] (est.)

References