Green Line (Delhi Metro)

The Green Line (Line 5) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India. The line consists of 24 stations covering a total length of 28.79  km. It runs between Inderlok and Brigadier Hoshiyar Singh with a branch line connecting the line's Ashok Park Main station with Kirti Nagar station.[2]

Green Line
(Line 5)
A new train being launched in the opening of the Kirti Nagar branch in 2011.
Overview
StatusFully Operational
OwnerDMRC
LocaleDelhi, Bahadurgarh
Termini
Stations24
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockMitsubishi-ROTEM-BEML
History
Opened
Technical
Line length28.79 km (17.89 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Highest elevation215 m
Route map

Kirti Nagar
Satguru Ram Singh Marg
Inderlok
Ashok Park Main
Punjabi Bagh
Ring Road
Punjabi Bagh West
Shivaji Park
Madipur
Paschim Vihar East
Paschim Vihar West
Outer Ring Road
Peeragarhi
Udyog Nagar
Maharaja Surajmal Stadium
Najafgarh Road
Nangloi
Nangloi Railway Station
Rajdhani Park
Mundka
Mundka Industrial Area (MIA)
Ghevra
Tikri Kalan
Tikri Border
Delhi
Haryana
border
Pandit Shree Ram Sharma
Bahadurgarh City
Brigadier Hoshiyar Singh

Inderlok
Daya Basti
Sarai Rohilla
Ajmal Khan Park
Nabi Karim
New Delhi
Zakir Hussain College
Delhi Gate
Mahatma Gandhi Marg
Raj Ghat
Indira Gandhi Indoor Stadium
Indraprastha
[1]

It is almost an elevated line except for Kirti Nagar Metro Station which is At Grade and runs mostly along the busy NH 9 route in North Delhi and North West Delhi, bypassing Tikri Border to enter Bahadurgarh. It is the first Delhi metro line on standard gauge, as opposed to 5 ft 6 in (1,676 mm) broad gauge, prevalent in Red, Yellow and Blue Lines.

A 12.37 km extension of Green Line with ten stations was approved by the Union Government in March 2024. Construction is expected to begin in 2024, as part of the fourth phase of the Delhi Metro's development, and is slated to be completed by 2029.[3][4][5]

History

The line was opened in two stages, with the 15.1 km Inderlok – Mundka section opening on 3 April 2010[6] and the 3.5 km Kirti Nagar – Ashok Park Main branch line on 27 August 2011. Though its route is shorter than other lines, the Green Line serves as a lifeline for Delhiites connecting to the Red and Blue Lines, as it covers major commercial and residential areas like Punjabi Bagh, Paschim Vihar, Nangloi and Mundka.

On 6 August 2012, in a step that will improve commuting in National Capital Region, the Union government approved the extension of Delhi Metro from Mundka to Bahadurgarh in Haryana. The 11.18 km metro stretch comprises seven stations with four of them in Delhi and the remaining three in Bahadurgarh -- Mundka Industrial Area, Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma (Modern Industrial Estate), Bahadurgarh City (Bus Stand) and Brigadier Hoshiar Singh (City Park).[7]

Construction work of this extension began in 2013 and was completed by the second half of 2018, as part of the Phase III expansion. Prime Minister Narendra Modi inaugurated the Mundka – Bahadurgarh stretch via video conferencing on 24 June 2018.

In late October 2019, it was decided to construct steel platforms on the viaduct of Green Line between Punjabi Bagh and Shivaji Park stations that will provide a seamless interchange between Green Line and Pink Line.[8] Construction began in that year itself and the new halt platform of Green Line, named Punjabi Bagh West, was thrown open to the public on 29 March 2022, after multiple delays.[9]

The new halt platform of Green Line is connected by a Foot Over Bridge (FOB), which links with the Punjabi Bagh West station of the Pink Line. The FOB is 212 metres long. The new platforms are 155 metres in length and are connected with the FOB by two extra-large lifts on each platform with a capacity of 26 passengers each as well as staircases.[9]

Stations

Main Line

Green Line
# Station Name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
English Hindi
1Indraprasthaइंद्रप्रस्थ42029Blue LineUndergroundIslandIndraprastha DepotAt Grade
2Delhi Sachivalayaदिल्ली सचिवालयNoneNone
3Delhi Gateदिल्ली गेटViolet Line
4LNJP Hospitalएलएनजेपी अस्पतालNone
5New Delhiनई दिल्लीYellow Line
Airport Express
New Delhi railway station
6Nabi Karimनबी करीमMagenta Line
(Phase 4 - Under Construction)
7Ajmal Khan Parkअजमल ख़ान पार्कNone
8Sarai Rohillaसराय रोहिल्लाDelhi Sarai Rohilla railway station
Vivekanand Puri Halt railway station
9Daya Bastiदया बस्तीDayabasti railway station
10Inderlokइंद्रलोक23 April 2010Red LineElevated
11Ashok Park Mainअशोक पार्क मेनGreen LineSide
12Punjabi Bagh Eastपंजाबी बाग़None
13Punjabi Bagh Westपंजाबी बाग़ पश्चिमPink Line
14Shivaji Parkशिवाजी पार्कShakurbasti railway station
15Madipurमादीपुर
16Paschim Vihar Eastपश्चिम विहार पूर्वNone
17Paschim Vihar Westपश्चिम विहार पश्चिम
18Peeragarhiपीरागढ़ीMagenta Line
(Phase 4 - Under Construction)
19Paschim Vihar Westउद्योग नगरNone
20Maharaja Surajmal Stadiumमहाराजा सूरजमल स्टेडियम
21Nangloiनांगलोई
22Nangloi Railway Stationनांगलोई रेलवे स्टेशनNangloi railway station
23Rajdhani Parkराजधानी पार्कNone
24MundkaमुंडकाMundka DepotAt Grade
25Mundka Industrial Area (MIA)मुंडका औद्योगिक क्षेत्र(एमआईए)324 June 2018None
26Ghevraघेवरा
27Tikri Kalanटीकरी कलाँ
28Tikri Borderटीकरी बॉर्डर
29Pandit Shree Ram Sharmaपंडित श्री राम शर्माBahadurgarh DepotAt Grade
30Bahadurgarh Cityबहादुरगढ़ सिटीNone
31Brigadier Hoshiyar Singhब्रिगेडियर होशियार सिंह

Branch Line

Green Line Branch
# Station Name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
EnglishHindi
1Ashok Park Main*अशोक पार्क मेन*23 April 2010Green LineElevatedSideNone
2Satguru Ram Singh Margसतगुरु राम सिंह मार्ग27 August 2011Patel Nagar Railway station
3Kirti Nagarकीर्ति नगरBlue LineAt Grade

Train Info

Green Line
Rakes Mitsubishi Hyundai Rotem BEML
Train Length 4
Train Gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification 25 kV, 50 Hz AC through overhead catenary
OHE
Train's Maximum Speed 100 km/h
Train Operation Delhi Metro

Infrastructure

Green Line is equipped with Bombardier Cityflo 350 signalling.[6]

Rolling stock

The Green Line uses standard gauge trains manufactured by a consortium of Mitsubishi, Hyundai Rotem and Bharat Earth Movers (BEML). A total of 196 cars for the Green Line and the Violet Line were ordered for both 4-car configurations (46 trains) and 6-car configurations (2 trains). One train was manufactured in Changwon in South Korea and rest of the trains were manufactured at BEML's facility in Bangalore. Width of these trains is 2.9 meters as compared to 3.2 meters on broad gauge trains.[10]

See also

References

  1. "Delhi Metro Phase 4 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 13 February 2024.
  2. "PM Narendra Modi inaugurates Mundka-Bahardurgarh metro network".
  3. "Delhi to get two new Metro lines: Lajpat Nagar-Saket, Inderlok-Indraprastha". The Indian Express. 13 March 2024. Retrieved 5 April 2024.
  4. "Delhi Metro Phase-IV: Union Cabinet approves two corridors of Delhi Metro Projects". The Hindu. 13 March 2024. ISSN 0971-751X. Retrieved 5 April 2024.
  5. "Union Cabinet approves two new Metro lines in Delhi; check routes, stations". Business Today. 13 March 2024. Retrieved 5 April 2024.
  6. "Delhi metro opens first standard gauge line". Railway Gazette. 6 April 2010. Archived from the original on 29 June 2010. Retrieved 5 September 2010.
  7. Krar, Prashant (7 August 2012). "Centre approves Delhi-Bahadurgarh metro link". The Economic Times. ISSN 0013-0389. Retrieved 5 April 2024.
  8. "Delhi: When changing stations means you have to get down in the middle of the metro track | Delhi News - Times of India". The Times of India. TNN. 18 October 2019. Retrieved 9 April 2021.
  9. "Delhi metro's first interchange station inaugurated at Punjabi Bagh, connects Green line to Pink line". Home News India. West Punjabi Bagh, Punjabi Bagh, Delhi. 29 March 2022. Retrieved 31 March 2022.
  10. "Delhi Metro gets standard gauge train". Hindu Business Line. 18 March 2009. Archived from the original on 23 June 2009. Retrieved 5 September 2010.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.