Kudlu Gate metro station

Kudlu Gate is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.

Kudlu Gate
Namma Metro station
Final stages of this metro station as of April 2024
General information
LocationHosur Rd, Kudlu Gate, Industrial Layout, Singasandra, Bengaluru, Karnataka 560068
Coordinates12.88992°N 77.63929°E / 12.88992; 77.63929
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Central Silk Board / Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
Platform numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningNovember 2024 (November 2024) (TBC)
Electrified750 V DC third rail (TBC)
Services
Preceding station Namma Metro Following station
Hongasandra Yellow Line
(Operational around November 2024)
Singasandra
towards Bommasandra
Location

As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations. [1][2][3][4][5]

Station layout

Station Layout (TBC)

Kudlu Gate track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left
Platform 2
Southbound
Towards → Bommasandra next station is Singasandra
Platform 1
Northbound
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road next station is Hongasandra
Side platform | Doors will open on the left
L2

Entry/Exits

See also

References