Line 3 (Madurai Metro)

The Purple Line (Line 3) is one of the three proposed lines of Madurai Metro which is to be implemented at the Phase 2 of Madurai Metro. The line stretches from Manalur to Chekanurani. The line consists of 19 stations. [1][2]

Purple Line (Line 3)
Overview
StatusProposed
Termini
  • Manalur
  • Chekanurani
Stations19
Service
TypeRapid transit
SystemMadurai Metro
Operator(s)CMRL
History
Planned openingDecember 2027
Technical
Line length23 km (14 mi)
Number of tracks2
Operating speed60 km/h (37 mph)
Route map

Manalur
Silaiman
Puliyankulam
Velammal College
Viraganoor
Teppakulam
Munichalai
Keelavasal
Therkuvasal Line 2
Madurai Junction
Arasaradi
Arapalayam
Bethaniapuram
Kalavasal
HMS Colony
Achampattu
Nagamalai Pudukkottai
Vadapalanji
Chekanurani

Stations

The stations proposed in the Phase 2 of Madurai Metro in the Purple Line (Line 3) are as follows:- [3][4]

Purple Line (Line 3)
S.No Station Name Interchange connection Places Connected Layout Opened Depot Connection Depot Layout
EnglishTamil
1Manalurமணலூர்NoneNone(TBC)Proposed Phase 3Manalur DepotNone
2Silaimanசிலைமான்NoneNone(TBC)Proposed Phase 3NoneNone
3Puliyankulamபுளியங்குளம்NoneNone(TBC)Proposed Phase 3NoneNone
4Velammal Collegeவேலம்மாள் கல்லூரிNoneNone(TBC)Proposed Phase 3NoneNone
5Viraganoorவிரகனூர்NoneNone(TBC)Proposed Phase 3NoneNone
6Teppakulamதெப்பக்குளம்NoneNone(TBC)Proposed Phase 3NoneNone
7Munichalaiமுனிச்சாலைNoneNone(TBC)Proposed Phase 3NoneNone
8Keelavasalகீழவாசல்NoneNone(TBC)Proposed Phase 3NoneNone
9Therkuvasalதெற்குவாசல்NoneMeenakshi Amman Temple South Tower, Thirumalai Nayakkar Mahal, Line 2UndergroundProposed Phase 3NoneNone
10Madurai Junctionமதுரை சந்திப்பு Madurai Junction, Periyar Bus TerminusMeenakshi Amman Temple West Tower, Line 1, Line 2UndergroundProposed Phase 3NoneNone
11ArasaradiஅரசரடிNoneNone(TBC)Proposed Phase 3NoneNone
12Arapalayamஆரப்பாளையம்NoneNone(TBC)Proposed Phase 3NoneNone
13Bethaniapuramபெத்தானியாபுரம்NoneNone(TBC)Proposed Phase 3NoneNone
14Kalavasalகலைவாசல்NoneNone(TBC)Proposed Phase 3NoneNone
15HMS Colonyஎச்.எம்.எஸ் காலனிNoneNone(TBC)Proposed Phase 3NoneNone
16Achampattuஅச்சம்பட்டுNoneNone(TBC)Proposed Phase 3NoneNone
17Nagamalai Pudukkottaiநாகமலை புதுக்கோட்டைNoneNone(TBC)Proposed Phase 3NoneNone
18Vadapalanjiவடபழஞ்சிNoneNone(TBC)Proposed Phase 3NoneNone
19Chekanuraniசெக்கனுராணிNoneNone(TBC)Proposed Phase 3NoneNone

See also

References

  1. "Instagram". www.instagram.com. Retrieved 29 March 2024.
  2. Balasubramanian, Harini (8 April 2023). "Madurai Metro to link international airport under Phase 2". Housing News. Retrieved 29 March 2024.
  3. "Madurai metro to link airport in phase II; 5 km to be underground". Retrieved 7 April 2023.
  4. Staff, T. N. M. (20 February 2023). "Madurai metro: CMRL submits feasibility report, three things to know". The News Minute. Retrieved 29 March 2024.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.